Skip to content

Material Traceability, PMI and NDT in Chennai

Every Nobel Weld order ships with a documented quality record: material traceability from the heat number on the mill certificate, PMI, NDT and inspection reports, and a final data book.

Codes, procedures and tests are agreed in a quality assurance plan before work starts, and release can be by your nominated inspection agency.

Material traceability, PMI and NDT: machined titanium bolts ready for final inspection

Inspection and testing

  • Positive material identification (PMI)
  • Dye penetrant testing (DPT)
  • Radiography (RT) and ultrasonic testing (UT)
  • Hydrostatic and pneumatic testing
  • Dimensional and visual inspection

Documentation package

  • Quality assurance plan (QAP) / inspection and test plan (ITP)
  • EN 10204 3.1 mill certificates
  • WPS, PQR and WPQ records
  • NDT and pressure-test reports
  • Final data book with traceability

Codes and standards

Code or standardScope
ASME Sec VIII Div 1Pressure parts
ASME Sec IXWelding qualification
ASME Sec IIMaterials
ASME B31.3Process piping
ASME B16.5 / B16.9Flanges and fittings
ASTM B265 / B348 / B337Titanium
ASTM B127 / B443 / B575Nickel alloys
ISO 9001:2015Implementation in progress

Material traceability, PMI and NDT for reactive metals

Titanium and zirconium welds are accepted by colour as well as by NDT. Silver and light straw show the weld was fully shielded; darker colours show oxygen pick-up. We record the weld colour with the other inspection results.

  1. Silver

    Accept

  2. Light straw

    Accept

  3. Dark straw

    Per specification

  4. Bronze

    Reject

  5. Violet

    Reject

  6. Blue

    Reject

  7. Grey or white

    Reject

Typical titanium weld colour guidance. The customer specification governs acceptance.

Need a QAP or sample data book?

Send your specification and we will share the inspection and test plan we propose for your order.

CallWhatsAppGet a quote